Drafting
| MECHANICAL DESIGN: HIENZ - 2001 |
Assisting the plant Engineer in the new Product line, With mechanical detailed design drawings, of new conveyor systems, safety guarding, accesses stairs and platforms and had railing, up dating existing plant layouts as well as assisting the plant engineer in the project management of the installation of new machinery and components, as well as up dating of plant drawings.
AutoCAD 2002.
3 months contract
|
| DESIGN: PARKER HANAFORD 2002 |
Re-design a series 43 fitting, Supply mechanical detailed drawings of a series 43 fitting to Parker Hanford specification.
AutoCAD 2002
4 weeks contract
|
| PROJECT MANAGEMENT: COLUMBERA CONSTRUCTIONS 2003 |
Construction of the Clear Water Tank at Cobram, Supply construction drawings of concrete tank form work, access stairs and platforms, structural layouts of the roof into workshop drawing, P&ID’S of tank piping to water treatment plant, supply as built drawing, management of materials and contractors, quotations and materials order.
AutoCAD 2002
3 months contract
|
| MECHANICAL DESIGN: SUN RICE LEETON 2004 |
Assisting the Project Engineer in the installation of the new Rice Cakes Line, Mechanical detailed design drawings of the Defection Roller, mechanical proposal layout, conveyor systems, plant machinery layouts, P&ID proposal layout, safety guarding, accesses stairs and platforms and had railing, up dating existing plant layouts, assisting the installation of new components and equipment, up dating of plant drawings.
AutoCAD 2002.
3 months contract May-Aug 04
|
| MECHANICAL DESIGN: NORSKE SKOG ALBURTY - 2004 |
Mechanical detailed design drawings of the Paper Roll Guillotine Stop, Modification to the Floating Pond Spray System, Couplings safety guarding, accesses stairs and platforms and had railing, up dating existing plant layouts, up dating of mechanical drawings. AutoCAD 2002- Inventor 9
3 months contract Jul-Oct 04
|
| P&ID’S: SKM DARWIN RANGER MINE 2004 |
Assist in the site inspection and up dating of the Portable water, Acid line RP1, RP2, Pond water, plant Air, Mill Air,
AutoCad 2002/Mech-Q
4 weeks contract Dec 04
|
| MECHANICAL DESIGN: PERILYA MINE BROKEN HILL - 2005 |
Assist the Head Engineer in the up grade of safety guarding, accesses stairs and platforms with mechanical detailed design drawings. Mechanical proposal layout of conveyor systems as well as plant machinery layouts, up dating existing plant layouts, assisting the installation of new components and equipment, up dating of plant drawings. AutoCAD 2005/meridian system. Ref: Chris Auld Manager of Engineering. (08) 80888663
3 months contract Jul-Oct
|
| MECHANICAL DESIGN: PERILYA MINE BROKEN HILL - 2006 |
Up date surface all air/Water P&ID’s map underground Air & Water lines new dwg;s for surface/underground sand fill lines, implement new drafting standards for Potosi open cut mine. Layouts and design work of new open cut mine (Potosi) update sand fill into Vulcan, transfer dwg’s from Microstation to AutoCAD 06, as well assist the Head Engineer in the up grade of safety guarding, accesses stairs and platforms with mechanical detailed design drawings.
Mechanical proposal layout of conveyor systems as well as plant machinery layouts. Up dating existing plant layouts, assisting the installation of new components and equipment, up dating of plant drawings. AutoCAD06 2005/Meridian system. Ref: Chris Auld Manager of Engineering. (08) 80888663
10 months contract Feb-Dec 06
|
|  |

|
|